OFFICIAL PROCUREMENT & BIDDING PORTALPRECISION. PERFORMANCE. PROFIT.
Official electronic procurement portal for Staunch Management & Consultancy. Access unpriced Bills of Quantities (BOQs), submit encrypted technical & financial proposals, and track real-time evaluations across Pan-African energy and civil infrastructure projects.
Staunch Management & Consultancy (SM-CL) invites expressions of interest and competitive technical/commercial EPC tenders for the turnkey design, financing syndication, engineering, procurement, and construction of the landmark Donholm Mixed-Use Commercial Center & High-Density Residential Urban Development located in Donholm, Embakasi East, Nairobi County. The project encompasses the master planning and phased structural execution of modern multi-storey commercial retail plazas, grade-A office spaces, anchor supermarket amenities, high-density residential apartment blocks, integrated green recreational zones, and associated civil infrastructure (dedicated access boulevards, underground drainage, borehole water treatment, and solar microgrid integration). Key Parameters & Development Specifications: β’ Project Location: Prime road-frontage acreage, Donholm, Nairobi East β’ Development Typology: Mixed-use master-planned precinct (Retail / Commercial Offices / Modern High-Density Residential Apartments) β’ Land Status: Freehold/Long-term Leasehold with complete title documentation and bankable professional valuation β’ Sustainable Infrastructure: Rooftop solar photovoltaic installations, decentralized wastewater treatment plant, stormwater retention, and biometric access control β’ Project Value (CAPEX): KES 1,850,000,000 - KES 2,750,000,000 (Approx. USD 14.5M - 21.5M) β’ Delivery Framework: Engineering, Procurement, Construction (EPC) + Joint Venture / PPP Development Syndication.
Create an account to submit proposals and access BOQs.
A single-page, institutional-grade overview of our 6 active pipeline opportunities spanning Utility-Scale Solar PV, BESS Energy Storage, High-Voltage Substations, Mixed-Use Commercial Real Estate, and Global Supply Chains across Kenya, Zambia, Turkey, and China.
Staunch Management & Consultancy (SM-CL) invites expressions of interest and competitive technical/commercial EPC tenders for the turnkey design, financing syndication, engineering, procurement, and construction of the landmark Donholm Mixed-Use Commercial Center & High-Density Residential Urban Development located in Donholm, Embakasi East, Nairobi County. The project encompasses the master planning and phased structural execution of modern multi-storey commercial retail plazas, grade-A office spaces, anchor supermarket amenities, high-density residential apartment blocks, integrated green recreational zones, and associated civil infrastructure (dedicated access boulevards, underground drainage, borehole water treatment, and solar microgrid integration). Key Parameters & Development Specifications: β’ Project Location: Prime road-frontage acreage, Donholm, Nairobi East β’ Development Typology: Mixed-use master-planned precinct (Retail / Commercial Offices / Modern High-Density Residential Apartments) β’ Land Status: Freehold/Long-term Leasehold with complete title documentation and bankable professional valuation β’ Sustainable Infrastructure: Rooftop solar photovoltaic installations, decentralized wastewater treatment plant, stormwater retention, and biometric access control β’ Project Value (CAPEX): KES 1,850,000,000 - KES 2,750,000,000 (Approx. USD 14.5M - 21.5M) β’ Delivery Framework: Engineering, Procurement, Construction (EPC) + Joint Venture / PPP Development Syndication.
Magarini Solar Park Limited proposes the turnkey development, engineering, procurement, construction, and grid interconnection of a 200MWac (220MWp DC) Solar Photovoltaic Park with a 75MWh Battery Energy Storage System (BESS) in Dakacha Sub Location, Marafa Ward, Magarini Sub County, Kilifi County, Kenya. The project is phased (Installed Capacity Phase 1: 40 MWac / 44 MWp DC with 75MWh BESS), generating clean electricity from the coastal solar resource (annual GHI averaging 2,229 kW/mΒ²/year) to supply approximately 78,250 MWh annually into the Kenyan national grid under an agreed PPA framework. Key Parameters & Technical Metrics: β’ Installed Capacity: 200 MWac (Phase 1: 40 MWac / 44 MWp DC) β’ Battery Energy Storage: 75 MWh BESS for frequency response, output smoothing, and peak-load shifting β’ Annual Energy Yield: ~78,250 MWh with 78.7% Performance Ratio (PR) β’ Solar Technology: Single-axis tracking or fixed-tilt bifacial PV modules (10Β° inclination, Southwest orientation) β’ Land Availability: 10,000-acre tract secured at Magarini Farm (~1,000 acres allocated for 200MW footprint), flat red agricultural terrain β’ Power Evacuation: 220kV Malindi-Garsen transmission line, terminating at 220/33kV Malindi Substation (Kakuyuni), 35-50 km from site (nearest tower 12-18 km) β’ Total Estimated Investment first Phase (CAPEX): $62,860,699 USD (~$62.88 Million USD) β’ First-Year Operating Expenses, First Phase (OPEX): $1,200,000 USD/year ($27.42/kWp).
Ol-Ndanyat Power Ltd has received official clearance from the Kenya Wildlife Service (KWS Ref: KWS/NGO/912 VOL. I) for the installation of Wind Turbine Generators on private land at Plot No KJD/LOODARIAK/1768, Kona Barid. Staunch Management & Consultancy invites sealed EPC proposals from certified wind energy contractors for civil foundation works, turbine delivery and erection, step-up substation build, and grid integration away from conservation areas. Key Parameters: β’ Verified KWS Environmental Clearance β’ Heavy civil foundation and specialized wind turbine generator (WTG) installation β’ High-voltage substation and evacuation transmission line to the national grid.
Turnkey transaction advisory, environmental impact study, and procurement oversight for a regional solar-powered cold-storage agricultural port and export logistics facility along the Lake Victoria transport corridor.
Soy Solar Limited (Ref: SOY2019/008/03/ERC) has been licensed by the Energy Regulatory Commission (Ref: EPRA/ER/7/DK/rb) to develop a 40MW Solar Off-Grid Plant in Ngendalele, Kericho County. The project is a strategic initiative aimed at addressing energy poverty in remote and underserved regions of Kenya, leveraging sustainable and decentralized solar solutions under the Kenya Off-grid Solar Access Project (KOSAP). Key Parameters: β’ Plant Capacity: 40MW PV (74,545 panels @ 550Wp, 200 x 200kW PV String Inverters) β’ Battery Energy Storage: 18MW / 9MWh BESS β’ Power Distribution Network: 17km Low Voltage (LV) + 9km Medium Voltage (MV) Network Build β’ Land Size: 300 Acres β’ 20-Year PPA with Feed-in-Tariff of $0.075/kWh β’ Projected Annual Gross Generation: 110,333,952 kWh/year ($8,275,046 Annual Revenue) β’ Includes $2,000,400 Corporate Social Responsibility (CSR) Community Value-Add Package across Kericho constituencies.
International competitive tender for the manufacturing, factory acceptance testing (FAT), and maritime shipping of 33kV/132kV power step-up and step-down transformers, switchgear, and concrete pole hardware for regional African renewable projects.
Bulk procurement and delivery framework for 150MW+ of Tier-1 bifacial monocrystalline solar PV modules (550Wp - 650Wp) and 200kW string inverters for multi-country solar installations across Kenya and Zambia.
Kadewele Energy Limited is developing a 40MW solar energy project with Battery Storage in Lundazi, Chief Kapichila Area, Eastern Province of Zambia. The project is designed to produce electrical power for the national grid and mitigate the regional energy deficit. Key Parameters: β’ Capacity: 40MW Contracted (45MW Designed Installation) with Battery Storage β’ Power Purchase Agreement: 20-Year PPA agreed and signed with ZESCO Limited (National Power Utility of Zambia / Industrial Development Corporation - IDC) β’ Funding Investment: Total required project funding investment of USD 67,500,000 β’ Project Acquisition / Equity Option: 100% project acquisition available at USD 5,500,000 with USD 2,000,000 upfront commitment fee (Mandated Transaction Advisor: Finsworth Investments Limited) β’ Turnkey EPC and Developer syndication.
Supply and Delivery of Petroleum products - - PMS - ARGO - IK - Jet A-1 - LPG
This is a major integrated housing development opportunity available under the Affordable Housing Programme (AHP) for the proposed Agricity development in Eastern Kenya, incorporating residential accommodation, market and commercial facilities, community amenities, and supporting infrastructure. The site is located in Kikuyu, Kiambu County, on approximately 11.3 acres, with a planned development comprising 2,556 residential units across 27 blocks and an estimated built-up area of 182,610.52 mΒ². The procurement covers the construction and commissioning of the development, along with associated social amenities and infrastructure.
Qualified manufacturers, authorized distributors, international suppliers, trading companies, and suitably experienced contractors are invited to participate in a substantial procurement opportunity for the supply and delivery of uniforms, footwear, and military field equipment.
Qualified manufacturers, authorized distributors, international suppliers, trading companies, and suitably experienced contractors are invited to participate in a substantial procurement opportunity for the supply and delivery of military light and heavy vehicles, and related transport and maintenance supplies
The Ministry of Energy and Dams seeks an experienced solar engineering and advisory consortium to perform a comprehensive technical audit, commercial settlement restructuring, and final grid commissioning for the constructed 20MWac Solar Photovoltaic Plant and 35MWh Battery Energy Storage System (BESS) located in Nesitu, Central Equatoria. Project Background: β’ Facility Specifications: 20MW Solar PV Array + 35MWh Containerized BESS β’ Construction Status: Physical construction of the solar field and battery containers completed since June 2023; pending final commercial clearance and grid commissioning into the Juba municipal network. β’ Objective: Resolution of contractor commercial tranches, technical pre-commissioning testing, SCADA inverter synchronization, and immediate commercial operation to inject 20MW clean power into Juba. β’ Estimated Capital Envelope: USD $12,000,000 β $18,500,000 (incorporating commercial settlement, technical upgrades, and 5-year O&M takeover).
Official Ministry of Energy and Dams Project (Section 1.1, S/N 5): Electrification of Rumbek and Yambio towns. Current Project Status: The Power Plants and the Distribution Networks are completed and they were funded by the Egyptian government and now waiting the official inauguration and handover. Note: Provisional commercial envelope assigned ($25M - $35M USD) covering operationalization, metering infrastructure, and initial multi-year utility management.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 8): Electrification of Border towns (Nimule and Kaya). Current Project Status: The construction of the networks is already completed since 2023 by the Uganda Government as a grant and South Sudan Electricity Corporation (SSEC) is installing the meters to energize, but financial constraints remain a challenge. Note: Provisional figure assigned ($15M - $24M USD) to address financial constraints, complete meter rollout, and establish commercial revenue recovery.
Key Project Highlights Strategic Scope & Master Plan β’ Prime Location: Situated on approximately 6.7 acres in Ewaso Onkindongi Constituency, Kajiado County. β’ Substantial Scale: Total built area of 72,960 sqm across 4 G+4 blocks. β’ Balanced Unit Distribution (800 Total Units + Retail): o Affordable Housing: 140 two-bedroom apartments & 140 three-bedroom apartments. o Market Housing: 260 two-bedroom apartments & 260 three-bedroom apartments. o Commercial Space: 32 retail shop units. Modern Amenities & Infrastructure β’ Sports & Recreation: On-site basketball pitch. β’ Essential Utilities: Dedicated powerhouse, underground water storage tank, and structured garbage receptacle. β’ Site Enhancements: Perimeter masonry fence, guarded security entry, full landscaping, and integrated roads and parking works.
We are seeking qualified, technically capable, and financially sound technology partners for the provision, integration, deployment, and support of an Integrated Border Protection and Surveillance System designed to enhance national border security, situational awareness, early-warning capability, and coordinated response to unauthorized cross-border activity. The proposed solution is envisaged as a multi-layered hardware and software security architecture integrating ground-surveillance radar, electro-optical/infrared surveillance, mobile patrol systems, unmanned aerial surveillance, biometric identification, intelligent video analytics, communications, and command-and-control capabilities into a unified operational environment.
The Ministry of Energy and Dams of South Sudan announces a consolidated procurement package for the turnkey EPC delivery of utility-scale Solar Photovoltaic (PV) plants paired with Battery Energy Storage Systems (BESS) across seven state capitals to displace expensive diesel generation and achieve universal clean power access. Portfolio Breakdown by State Capital: β’ Malakal Power Plant: 50 MW Solar PV β’ Aweil Power Plant: 30 MW Solar PV + BESS β’ Pibor Power Plant: 20 MW Solar PV + BESS β’ Abyei Power Plant: 20 MW Solar PV + BESS β’ Bor Power Plant: 20 MW Solar PV (Hybridizing existing 2MW diesel plant) β’ Kuajok (Warrap State) Power Plant: 10 MW Solar PV + BESS β’ Torit (Eastern Equatoria) Power Plant: 10 MW Solar PV + BESS Total Portfolio Size: 170 MW Solar PV + 85MWh BESS Storage Estimated Total CAPEX: USD $155,000,000 β $210,000,000 Execution Framework: EPC lots available individually per state capital or as a consolidated multi-state portfolio package.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 4): Electrification of the three capital cities Kuajok, Torit, Pariang by Solar. Current Project Status: Feasibility Study was carried-out by UNOPS on how to electrify these towns by Solar. UNOPS is now mobilizing the funds for the construction. Note: Provisional CAPEX figure assigned ($45M - $65M USD), to be edited following final construction funding packages.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 6): Electrification of Wau town. Current Project Status: Trinity Energy Company is still to complete the remaining generation power plant and the distribution network (25% of the town has been completed and already energized). Not commissioned yet. Note: Provisional CAPEX figure assigned ($30M - $48M USD) for completion of remaining 75% generation and distribution network.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 7): World Bank Energy Access (ASSIST) Project. Current Project Status: Project has been approved. Already 8 Consultants have been recruited and the process of recruitment of other Consultants is still going on. Note: Provisional program envelope assigned ($50M - $75M USD) for implementation consultancy, grid densification, and technical assistance.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 9): Development of 50MW Solar Power Plant in Juba by the Chinese TBEA Co. Current Project Status: The Project has been Approved by the Council of Ministers (COM) and the issue of community land finalization is currently being completed. Note: Provisional CAPEX figure assigned ($55M - $72M USD), to be updated upon final commercial closure.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 10): Electrification of Kuajok in Warrap State. Current Project Status: MOU was signed between Ministry of Energy and Dams (MED) and MASTER PREMIER GREEN ENERGY CO. LTD. Note: Provisional CAPEX figure assigned ($18M - $26M USD), to be edited upon final project agreement.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 11): Electrification of Aweil in Northern Bahr-EL-Gazal state. Current Project Status: MOU was signed between MED and SunGate Company, and Concession Agreement is currently being finalized. Note: Provisional CAPEX figure assigned ($28M - $40M USD), to be updated upon finalization of the Concession Agreement.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 12): Electrification of Yirol in Lakes State. Current Project Status: MOU was signed between Ministry of Energy and Dams (MED) and PLEROMA CONSTRUCTION COMPANY Ltd. Note: Provisional CAPEX figure assigned ($16M - $24M USD), to be edited following formal concession signoff.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 15): Yambio Power Plant. Current Project Status: Generation power plant and municipal network expansion under Ministry of Energy and Dams development program. Note: Provisional CAPEX figure assigned ($14M - $20M USD) to be updated upon final engineering specification.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 16): Rumbek Power Plant. Current Project Status: Generation plant rehabilitation, diesel engine overhaul, and solar hybrid conversion under Ministry oversight. Note: Provisional CAPEX figure assigned ($15M - $22M USD) to be edited following final asset condition audit.
The Ministry of Energy and Dams of the Republic of South Sudan invites independent power producers (IPPs), gas-to-power developers, and turnkey EPC contractors to bid for the design, procurement, construction, and operation of the landmark Tharjath 500MW Combined Cycle Gas Turbine (CCGT) Power Plant in Unity State. Project Highlights: β’ Proposed Installed Capacity: 500 MW Combined Cycle Gas Turbine (CCGT) β’ Fuel Source: Associated petroleum gas and domestic natural gas from the prolific Tharjath oilfield blocks, monetizing flared gas and providing cost-effective baseload power. β’ Technology: Multi-shaft CCGT configuration (Heavy-duty gas turbines + Heat Recovery Steam Generators (HRSG) + Steam turbine generator) delivering thermal efficiency exceeding 54%. β’ Project CAPEX: USD $420,000,000 β $500,000,000. β’ Grid Off-take: Powering oil extraction facilities, regional state capitals (Bentiu, Rumbek, Wau), and feeding into the planned 220kV national transmission corridor.
The Ministry of Energy and Dams of the Republic of South Sudan invites expressions of interest and competitive turnkey EPC bids for the engineering, procurement, financing syndication, and construction of the high-voltage 220kV Overhead Transmission Line (OHTL) connecting the Kenyan national grid at Lokichogio to Kapoeta, Torit, and the capital city Juba. Project Significance & Regional Interconnection: β’ Total Transmission Line Distance: 645.6 Kilometers β’ Operating Voltage: 220 kV Double-Circuit Overhead Transmission Line (OHTL) β’ Transmission Corridor: Lokichogio (Kenya Border) β Kapoeta β Torit β Juba Terminal Substation β’ Strategic Mandate: Connecting South Sudan to the Eastern Africa Power Pool (EAPP) regional grid to import and wheel affordable, reliable electrical power, enhancing regional energy security and bilateral industrial trade between Kenya and South Sudan. β’ Associated Substation Infrastructure: Construction of new 220/132/33kV step-down transformer substations at Kapoeta, Torit, and expansion of the Juba bulk power receiving terminal. β’ Estimated Capital Investment: USD $195,000,000 β $245,000,000. β’ Official Ministry Dossier: Document Ref: RSS/MED/GRID/2026/01 β Ministry of Energy and Dams, Office of the Minister, Republic of South Sudan.
The Ministry of Energy and Dams invites world-class engineering, procurement, and construction (EPC) contractors and infrastructure investment funds to submit qualifications for the development and execution of the Bedden Hydropower Project in Rajaf, Central Equatoria. Project Specifications: β’ Generation Capacity: 540 MW β 780 MW β’ Project Investment Cost: USD $1,452,000,000 ($1.452 Billion USD) β’ Location: Rajaf, Central Equatoria State (Strategic proximity to Juba capital load center) β’ Project Status: Comprehensive feasibility study completed; open for EPC execution, equipment supply, and project debt/equity syndication tranches. β’ Power Evacuation: High-voltage transmission evacuation directly into the Juba metropolitan grid and regional high-voltage interconnector. β’ Sponsoring Ministry: Ministry of Energy and Dams, Republic of South Sudan, Office of the Minister.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 1): Interconnection of South Sudan-Uganda 400kV Transmission Line Project. Current Project Status: Feasibility Study is on-going and the final Report will be submitted and funded by African Development Bank (AfDB) under a 100% grant for Feasibility study and construction. Note: Provisional CAPEX figure assigned for portal syndication ($180M - $225M USD), subject to revision upon completion of AfDB final feasibility report.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 2): Interconnection of South Sudan-Ethiopia 230/220kV Transmission Line Project. Current Project Status: The recruitment process of Consultancy Firm to carry out the Feasibility Study is to be completed. Feasibility Study funded by AfDB as a grant. Note: Provisional CAPEX figure assigned for portal syndication ($140M - $175M USD), to be updated upon final consultancy determination.
Official Ministry of Energy and Dams Project (Section 1.1, S/N 14): Juba Rumbek-Wau Kuajok 220kV Transmission Line. Current Project Status: MOU was signed between Ministry of Energy and Dams (MED) and MCC Chinese Co. Ltd. Note: Provisional CAPEX figure assigned ($160M - $215M USD), subject to detailed engineering survey and concession finalization.
The Ministry of Energy and Dams of the Republic of South Sudan invites global hydropower developers, engineering consortia, and development finance institutions (DFIs) to submit proposals for the turnkey EPC construction and private-public partnership (PPP/IPP) capital syndication of the Grand Fula Hydropower Plant Project on the White Nile River in Nimule, Eastern Equatoria. Project Technical & Economic Parameters: β’ Installed Generation Capacity: 890 MW β 1,080 MW β’ Total Project Cost: USD $1,558,000,000 ($1.558 Billion USD) β’ Location: Nimule, Eastern Equatoria, at the Fula Rapids along the White Nile corridor β’ Project Status: Comprehensive bankable feasibility studies conducted by international dam engineering specialists; currently structuring EPC delivery and long-term concessional financing. β’ Strategic Objective: South Sudan's premier baseload renewable generation asset, designed to supply domestic industry, eliminate reliance on heavy fuel oil, and export surplus power across the Eastern Africa Power Pool (EAPP). β’ Official Ministry Reference: Republic of South Sudan, Ministry of Energy and Dams β Office of the Minister.
The Government of the Republic of Uganda, through the Ministry of Energy and Mineral Development (MEMD) and the Uganda National Oil Company (UNOC), in strategic coordination with Staunch Management & Consultancy (SM-CL), invites expressions of interest, pre-qualification dossiers, and financing partnership proposals for the turnkey Engineering, Procurement, Construction, and Commissioning (EPCC) and equity/debt financing syndication of the Greenfield Albertine Graben Oil Refinery in Kabaale, Hoima District. Project Architecture & Technical Metrics: β’ Refining Capacity: 160,000 Barrels Per Day (BPD) β’ Total Project Capital Investment (CAPEX): USD ,000,000,000 (.0 Billion USD) β’ Project Delivery Structure: Public-Private Partnership (PPP) Concession Framework β’ Strategic Objective: Seeking qualified Lead Financing Partner / Consortium to syndicate private capital and co-develop the refinery under a long-term Build-Own-Operate-Transfer (BOOT) or Build-Own-Operate (BOO) concession model. β’ Feedstock: Domestic crude oil from the Albertine Graben petroleum basins (Lake Albert Basin: Tilenga & Kingfisher fields, with estimated reserves exceeding 6.5 billion barrels). β’ Refined Product Slate: Premium Euro-V standard Automotive Gasoline, Jet A-1 / Aviation Turbine Fuel (ATF), Ultra-Low Sulfur Diesel (ULSD), Liquefied Petroleum Gas (LPG), Heavy Fuel Oil (HFO), and Bitumen/Asphalt for national industrial use and regional exports across East Africa (Rwanda, Eastern DRC, South Sudan, and Western Kenya). β’ Sponsoring Entities: Ministry of Energy and Mineral Development (MEMD), Republic of Uganda, and Uganda National Oil Company (UNOC).
Contractor fees are subjected to clients upon registration to enable access to unpriced BOQs, confidential project briefs, and tender submissions.
For small businesses, local contractors & independent consultants looking for smaller project pieces.
For established mid-sized firms handling complete phases of EPC oversight and regional rollouts.
For multinational corporations & Tier-1 contractors bidding on multi-million/billion shilling flagships.
Staunch Management Consultancy (SMC) operates a rigorous, merit-based procurement framework that guarantees level-ground evaluation for local and international vendors.
Clear technical vs. financial criteria weighting ensures objective bid appraisal.
Download unpriced bills of quantities, architectural drawings, and terms of reference instantly.
Every bid is sealed until official opening date and tracked with immutable reference IDs.
Headquartered in Nairobi, Kenya, with strategic liaison offices in China and Turkey to support international EPC contractor syndication and capital sourcing.